Tape and plastic removed
Second Layer of Glass was added
below water line. Taped and covered
with plastic drop cloth....
Glass Applied
Views of the fourth and final epoxy
coat
Edge faired and sanded
Views of the fourth and final epoxy
coat
Views of the fourth and final epoxy
coat After a good cure, we removed
the canoe from the molds and the
inside was glassed, then we installed
the trim.
Glassing
Bow stem. A nice view down the stem,
showing the different wood colors
used in construction.
Building the Prospector Ranger
|
Dale smoothing out epoxy .
Off the forms and stretchers installed
to maintain the shape.
Wow, look at all the work we must do
to smooth the inside.
Scraping and sanding the inside - one
of the worst jobs of all. Note all the
different tools used!